Olenox Industries Inc. provides prefabricated modular structures using wood or steel as the base material for residential and commercial use in the United States. The company operates through three segments: Construction; Medical; and Development and Environmental. It provides fabricated and finished buildings, including floors, windows, doors, interior painting, electrical wiring and fixtures, plumbing outlets and bathrooms, roofing systems, as well as construction administration and/or project management services. The company also offers turnkey solutions to medical testing and treatment businesses; builds green single or multifamily projects; and offers medical and waste management solution that has a patented technology to collect waste and treat waste for safe disposal. It serves governments, hotels, offices, the medical community, contractors, home builders, building owners, and other resellers. The company was formerly known as Safe & Green Holdings Corp. and changed its name to Olenox Industries Inc. in January 2026. Olenox Industries Inc. was founded in 2007 and is headquartered in Miami, Florida.
Olenox Industries Reports 15.63 Bitcoin Mined in August as Company Advances Energy-Powered Digital Infrastructure Strategy
Olenox Industries mined approximately 15.63 Bitcoin in August through its CS Digital Ventures subsidiary, its second monthly operating update since closing the CS Digital acquisition on May 28, 2026.
The fleet averaged about 1.03 EH/s of operational hashrate, with realized hashrate at roughly 67% of economic capacity due to seasonal heat-related curtailment and low-power operation at Texas hosting sites. Installed capacity stands at 9,584 current-generation S21-class miners, roughly 35 MW and 2.19 EH/s nameplate, at about 16 joules per terahash.
Most of the fleet operates at third-party hosting facilities under profit-sharing arrangements, and August figures are preliminary, unaudited and net of mining-pool fees. Management is targeting power costs below $0.02 per kilowatt-hour for planned gas-powered digital infrastructure, a forward goal not reflected in the August results.